Energy supply system saves assembly time

  • What was needed: energy chain of the E4/4 light system from the 14240 series as a pre-assembled "readychain®" systems
  • Requirements: fast assembly of the energy supply, high cycle times and tight bend radius require a hard-wearing guide and cable solution, solution must be able to cope with the dusty and dry ambient conditions and at the same time be as light as possible to save energy
  • Industry: Wood and furniture processing industry
  • Success for the customer: pre-assembled readychain® systems enable particularly short installation, the electrical installation time has been almost halved; resilient chainflex® cables withstand the high dynamic load and guarantee high system availability; weight has been reduced thanks to the smooth-running energy chain
Large industrial installation with a gantry crane in a workshop.
Industrial robot with cable carrier in a production hall.
Guiding system with cables and hoses inside a machine.
A machine cable carrier guides cables and hoses through the production area.
Large cable reel on a pallet, wrapped in plastic film in the warehouse.

Consulting

I look forward to answering your questions

International company for Electrical Engineering, I.E.E. (Non-port business)+201144146285Write e-mail

Shipping and consultation